Roosevelt Elementary School, and once High School, has been a part of our Hubbard history since 1920. Many in our community hold fond memories of school years there attending classes, playing games in the gym and running around the playground with friends during recess. To ensure future generations of Hubbard youth have the opportunity to create memories of their own you can be a part of remodeling Roosevelt into a Student Wellness Center.

With the support of the Hubbard Board of Education, HYC, is raising the funds necessary to renovate Roosevelt for expanded use by Hubbard School teams and organizations as well as community youth sports leagues. An additional goal will be to see it used as a community center for Hubbard residents when not in use by our students. The renovations will be completed in phases or in whole based on the timeframe of funds raised through your tax deductible donations.

Renovation Includes
  • Weight room

  • Cardio area

  • Multisport exercise and practice areas with and without turf

  • Changing rooms with lockers

  • Multipurpose area for coach film sessions and other gatherings

  • Parent viewing area of practices

  • Secure storage areas

  • Community Gratitude Wall

thermometer.png

Phase 1

Raised: $90,000.00

Phase 2

Estimated: $118,000.00

Phase 3

Estimated: $44,000.00

Phase 4

Estimated: $62,000.00

Updated: 02/23/2024

P1 thermometer.png
Phase 1 — $90,000 Goal Reached!

Phase 1 includes both second floor balcony areas that are currently closed off and unusable. The newly updated renovation plan includes removal of the existing bleachers and extension of the concrete surface to increase the width of the platforms. The increased space will allow the second-floor platforms to be usable for batting cages and pitching machines on one side and a turfed training area that will be usable for all sports on the other side. Secure storage room(s) for equipment will also be created. These improved plans for the Phase 1 renovation have been unanimously approved by the HEVSD School Board and construction is scheduled to begin mid-March 2024. Phase 1 is estimated to be completed in 2-3 months.

Phase 2 — Current Fundraising

Anticipated to be the first floor seating areas. The newly upgraded Phase 2 renovation plan now includes removal of the existing bleachers on both sides of the gym floor and extension of the concrete surfaces to increase the width of the two platforms. The increased space will allow the first floor platforms to be usable, functional training areas for all sports that will include a weight room with squat racks, dumbbells, benches and free weights on one side; and on the other side a cardio area with ellipticals, treadmills, stationary bikes, and wrestling mat storage. Door(s) will also be installed on the weight room side so coaches and athletes can easily access the outdoor space for additional training. The upgraded plans for Phase 2 have been unanimously approved by the HEVSD School Board, so as soon as the funds for Phase 2 have been raised we will continue the renovation process and move to working on funding Phase 3. Once started, Phase 2 can be completed in a matter of 1-2 months.

How to Donate to the Roosevelt Renovation

You may make a one-time or reoccurring credit/debit card donation by clicking the Donate button below, find us on Venmo (@HubbardYouthCoalition) or by mailing your donation. Please include "Roosevelt Renovation" on any donation you would like to go directly to this project. As a non-profit 501(c)(3) public charity your donations are tax-deductible under IRC Section 170, and a copy of the IRS Determination Letter is available upon request to hubbardyouth@gmail.com.

Hubbard Youth Coalition Inc.

418 Parkview Drive

Hubbard, OH 44425

Helping Hands Helping Hubbard Youth

Project Development
and Management by:

BSHM
Renovations made possible through the generous donations
of our Hubbard community and the following contributors:
thank-background-vh9l7cz9otud7fyf.jpg
Sponsor Board Main Panel.png
Sponsor Board Right Panel.png
Sponsor Board Left Panel.png

501(c)(3) Public Charity. As part of our nonprofit corporate structure, HYC Directors do not receive compensation or benefits for their service.

bottom of page